Velocity Edge DualX Manual de Serviço Página 275

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 400
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 274
Reference, Installation, and Operations Manual Section 6: Meter operation
3-9000-743 Rev U August 2014
Audit log 249
Determining meter power-up and power-down times
The audit log can be used to determine the meter start (or re-start) time and the meter power-
down time by examining the PowerFailTime record(s). The PowerFailTime record time stamp
indicates (to within a few seconds) the time that the meter was started. The ‘as-left’ value
indicates the time (to within a few seconds) that the meter was powered-down.
Tracking ResetTrkParam
Tam p
Tam pHi
Tam pLo
Tam pSe n
Tam pWt
Ts pe
Ts pe H i
Ts pe L mt
Ts pe L o
Ts pe S en
Ts pe W t
Ts pf
Ts pf H i
Ts pf L o
Ts pf M at ch
Ts pf S en
Ts pf W t
Table 6-20 Audit log content
Data group Data point
Vista de página 274
1 2 ... 270 271 272 273 274 275 276 277 278 279 280 ... 399 400

Comentários a estes Manuais

Sem comentários