Velocity Edge DualX Manual de Serviço Página 328

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 400
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 327
304 Metrology - calibration equation parameters
Upgrading a Mark II to a Mark III Reference, Installation, and Operations Manual
August 2014 3-9000-743 Rev U
C.4.2 Metrology - calibration equation parameters
The Mark III calibration calculations are slightly different than those of the Mark II. The purpose
of this section is to illustrate the differences and show how the Mark II calibration values are
converted for use in the Mark III to achieve the same results.
Mark II Calibration
The Mark II calibration is comprised of three basic steps:
1. application of the “British Gas” (BG) Factor (see Equation C-1)
2. application of either the “A” polynomial coefficients (see Equation C-2) or the
(Velocity Offset, Meter Factor) parameters (see Equation C-3)
3. application of the 10-point linearization (optional)
Equation C-1 Mark II Application of the British Gas Factor
Equation C-2 Mark II Application of the “A” Polynomial Coefficients
Equation C-3 Mark II Application of the [VelOffset, MeterFactor]
v
BG
BG v
AvgWtd
=
v
DryCal
A
0
A
1
v+
BG
A
2
v
BG
2
A
3
v
BG
3
++=
A
0
A
1
BG v
AvgWtd
⋅⋅()A
2
BG
2
v
AvgWtd
2
⋅⋅()A
3
BG
3
v
AvgWtd
3
⋅⋅()++ +()=
v
DryCal
v
BG
VelOffset()MeterFactor=
v
AvgWtd
BG()VelOffset()MeterFactor=
Vista de página 327
1 2 ... 323 324 325 326 327 328 329 330 331 332 333 ... 399 400

Comentários a estes Manuais

Sem comentários